Transforming Water into Prosperity

Upper Maiwa Khola Hydropower Project (UMHP) is being developed by Kang Hydropower Co. Ltd. (KHCL). KHCL has awarded Contract to Samyak Engineering Pvt. Ltd (SEPL) to prepare Detailed Project Report study and detailed engineering study of the project. Prior to initiating the study, the technical team from SEPL made a visit to the project area. Based on the site visit and further study, the project has been fixed at an installed capacity of 17.85 MW with the gross natural head and design discharge of 515.00 m and 4.19 m3 /s, respectively.
This is to notify all shareholders that, as per the decision made by the Board of Directors meeting held on 2083/02/14, the company has decided to sell the unsubscribed reserved shares to existing shareholders of the company.
Kang Hydropower Company Limited announces its First Annual General Meeting (AGM) as per the decision of the Board of Directors.